Watershed - Fourteenmile Creek (CW07)
Fourteenmile Creek Watershed

Details

The Fourteen-mile Watershed is located in Adams, Wood, Portage and Waushara counties. Most wetlands in this watershed have been drained and converted for agricultural land use, thus reducing their filtering and water quality protection benefits. This transition has altered wind and water erosion of soils as well as drainage patterns into surface waters. This may be contributing to groundwater nitrate concentrations. In 2014, arrowhead and Sherwood lakes were listed as impaired for an unknown pollutant that was indicated by excess algal growth in the summer months. There is also a significate amount of nonpoint source pollution in the watershed. Sources include: runoff, fertilizer applications, poor septic systems, ditch erosion. To reduce excess nutrients in the watershed, the DNR has set four management goals which are to increase best management practices to reduce nutrient loading, reduce nutrient loading to groundwater, stabilize shorelines, and improve outreach campaigns. Land Use The current principal land uses within the watershed is forest and agriculture, including row crops, cranberry production, and timber production. The watershed lies almost entirely in the Central Sand Plains ecological landscape. Overall, there are 55,417 total acres in the watershed. Approximately 50% of acres consists of open water and wetlands, residential, non-agricultural grassland and pine forest plantations planted for pulp. Four county owned dams in the watershed form the three lakes commonly referred to as the Tri-Lakes (Sherwood, Camelot, and Arrowhead). There is significant amount of Water Quality monitoring data for the Tri-Lakes by citizen-based monitoring. The county, DNR, and Tri-Lakes Management District has been monitoring streams within the watershed since 2007. Endangered species in the area include Karner Blue Butterfly and Yellow Screwstem. Aquatic invasive species to look out for are Curly-Leaf Pondweed and Eurasian Watermilfoil.

Date  2022

Details

The Fourteen-mile Watershed is located in Adams, Wood, Portage and Waushara counties. A large portion of this area is referred to as the Leola Marsh. This area at one time was an extensive wetland that was ditched and drained for agricultural activities. There are several cranberry farms located in the watershed that utilize water for their operation. Water drawn from ditches reduces stream flow, decreases adult fish cover, reduces spawning areas for trout and likely exposes fish redds, and may result in an increase of water temperatures. Discharges from cranberry marshes can adversely affect water temperatures, deposit sediment, and release nutrients to the ditches. Periodic impounding of the ditches to flood marshes may prevent fish migration, increase water temperatures and de-water downstream reaches. This watershed was ranked using the Nonpoint Source Priority Selection Criteria. Based on surface and ground water data, the overall ranking is medium. This overall ranking establishes the watershed as a medium priority for future grant eligibility through the Nonpoint Source Program. The Adams County Soil Erosion Control plan identified the town of Leola as highest priority for conservation work to control wind erosion. This town is in the upper Fourteenmile Creek Watershed. Intense irrigation farming also occurs in the watershed leading to stream impacts from pesticides/herbicides and nutrients (Schultz). Many of the creeks have also been ditched for wetland drainage (Schultz).

Date  2002

Population, Land Use

The watershed mainly consists of farm fields and large parcels of grassland. Prairie chickens, an endangered species of Wisconsin, utilize grasslands, which need constant disturbance. These disturbances include prescribed burns, cuttings and summer cattle grazing. The large tracts of land are set-aside in Fourteenmile Creek watershed for maintaining grassland habitat which are state and partnership owned for the sole purpose of maintaining a prairie land habitat. Golden Sands Resource Conservation and Development Planning Agency studied wind erosion impacts on water quality in the watershed. The study found that wind eroded soil from agricultural crop fields is a source of sediment, nutrients and pesticides to surface waters in the watershed. Much of the agricultural activity includes potato and processing vegetable production. Typically, these farming activities result in smooth, flat seedbeds that are free of residues and are susceptible to wind erosion. Winter, late fall, and early spring are critical wind erosion periods. Wind erosion removes nutrient rich soils from fields depositing them into the ditches which increases sediment and nutrient loading to downstream lakes. The study recommends several practices that could be installed to protect the soils from being eroded by wind and thereby protect surface water quality. Some of these practices include; crop rotation, conservation tillage, cover crops, field wind breaks, nutrient management, pest management, crop residue management and wind barriers. These practices and others are explained further in the final report titled Wind Erosion Impacts on Water Quality in the Sand Plain of Central Wisconsin, 1993.

Date  2002

Ecological Landscapes for Fourteenmile Creek Watershed

Ecological Landscapes

The Fourteen Mile Creek Watershed is located primarily in the Central Sand Plains Ecological Landscape which is located in central Wisconsin, occurs on a flat, sandy lake plain, and supports agriculture, forestry, recreation, and wildlife management. The Ecological Landscape formed in and around what was once Glacial Lake Wisconsin, which contained glacial meltwater extending over 1.1 million acres at its highest stage. Soils are primarily sandy lake deposits, some with silt-loam loess caps. Sandstone buttes carved by rapid drainage of the glacial lake, or by wave action when they existed as islands in the lake, are distinctive features of this landscape. The historic vegetation of the area included extensive wetlands of many types, including open bogs, shrub swamps, and sedge meadows. Prairies, oak forests, savannas and barrens also occurred in the Ecological Landscape. An area of more mesic forest with white pine and hemlock was found in the northwest portion, including a significant pinery in eastern Jackson County. Today, nearly half of the Ecological Landscape is nonforested, in agriculture and grassland. Most of the historic wetlands were drained early in the 1900s and are now used for vegetable cropping. The forested portion is mostly oak-dominated forest, followed by aspen and pines. A minor portion is maple-basswood forest and lowland hardwoods.

Date  2010

Hydrologic Features

Much of the upper portion of the watershed has been ditched in the early 1900's for drainage of the land. The Drainage District continues to provide maintenance dredging in order to remove sediment and vegetation from the channel. According to the District, this practice promotes improved drainage of the adjacent agricultural fields. A recent decision by DATCAP requires maintenance dredging to go no deeper than the approved profile. The Department supports this because over-dredging removes critical in-stream habitat for trout and other aquatic organisms, creates deep, low velocity pools, increases sedimentation, increases in-stream habitat recovery time and reduces potential spawning areas. Fluctuating water levels and heavy siltation have reduced the trout population in the ditches. High nitrate values and streambank pasturing (sedimentation) can cause water quality problems in some of the streams in the watershed.

Date  2002

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Camelot Lake
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, H20 Quality: The Tri-Lakes Management District proposes to hire two interns during the summer months to conduct Clean Boats Clean Waters activities on Camelot, Sherwood and Arrowhead Lakes in Adams County. Major project elements to include: 1) monitoring landings for removal of invasives, 2) distribution, collection and processing of zebra mussel substrate sampler platforms, 3) collection of aquatic plant samples for phosphorus level determination.


Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Water Quality: The Tri-Lakes Management District proposes to hire two interns to conduct Clean Boats, Clean Waters (CBCW) monitoring and outreach and water quality sampling on Arrowhead, Camelot and Sherwood lakes in Adams County. Major project elements to include: 1) Intern wages and benefits, 2) Per Diem allowances, 3) CBCW materials, 4) Sample materials and analysis.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, H20 Quality: The Tri-Lakes Management District proposes to hire two interns during the summer months to conduct Clean Boats Clean Waters activities on Camelot, Sherwood and Arrowhead Lakes in Adams County. Major project elements to include: 1) monitoring landings for removal of invasives, 2) distribution, collection and processing of zebra mussel substrate sampler platforms, 3) collection of aquatic plant samples for phosphorus level determination.


Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Water Quality: The Tri-Lakes Management District proposes to hire two interns to conduct Clean Boats, Clean Waters (CBCW) monitoring and outreach and water quality sampling on Arrowhead, Camelot and Sherwood lakes in Adams County. Major project elements to include: 1) Intern wages and benefits, 2) Per Diem allowances, 3) CBCW materials, 4) Sample materials and analysis.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lake Arrowhead
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lake Sherwood
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2020 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on LAKE ARROWHEAD (COUNTY PARK, N/A), LAKE SHERWOOD(COUNTY PARK, N/A), LAKE CAMELOT (COUNTY PARK, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Castle Rock Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2020 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on LAKE ARROWHEAD (COUNTY PARK, N/A), LAKE SHERWOOD(COUNTY PARK, N/A), LAKE CAMELOT (COUNTY PARK, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2020 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on LAKE ARROWHEAD (COUNTY PARK, N/A), LAKE SHERWOOD(COUNTY PARK, N/A), LAKE CAMELOT (COUNTY PARK, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2020 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on LAKE ARROWHEAD (COUNTY PARK, N/A), LAKE SHERWOOD(COUNTY PARK, N/A), LAKE CAMELOT (COUNTY PARK, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2020
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2020 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2020 at 3 single public boat landings and 0 public boat landing pairs on LAKE ARROWHEAD (COUNTY PARK, N/A), LAKE SHERWOOD(COUNTY PARK, N/A), LAKE CAMELOT (COUNTY PARK, N/A).


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Wisconsin River
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Big Roche A Cri Creek
Status
Complete

Adams County: Lco-Adams Ordinance Imple. Assistance: The Adams County Land and Water Conservation Department proposes to facilitate revision of the county's Shoreland Protection Ordinance and to train a LWCD staff person to work with shoreland property owners to establish shoreland buffers and other practices necessary to comply with the new shoreland ordinance. Major project elements to include: 1) Staff training, 2) Outreach and counsulting to shoreland property owners, 3) Development of shoreline restoration plans and agreements, 4) Installation oversight, and 5) Update of the county's Riparian Buffer GIS layer to track practice installation.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Res-Big Roche-A-Cri Restoration 2: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners with highly erodable shorelines on Big Roche-a-Cri Lake. Grant funds will be distributed to the property owners to install shoreline protection, riparian buffers and stormwater management practices.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Buena Vista Creek
Status
Complete

Wood County: Lco-Shoreland Ordinance Rev.: Wood County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Bughs Lake
Status
Complete

Bughs Lake Management District: Hlk - Bughs Lake Public Landing Restoration Project: Partnering with property owners, the Bughs Lake management district is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of the Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
4/15/2018
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Upland & Fish Habitat On Camelot & Sherwood: This project implements best practices described in Wisconsin\2019s Healthy Lakes Implementation Plan. Practices may include fish sticks, 350 ft2 native plantings, diversion, rock infiltration, and rain gardens, and all best practices must follow the associated Healthy Lake technical guidance.

The best practices require a 10-year contract and must include minimum operation and maintenance requirements and data collection as described in grant condition #24. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the Sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #24 is required. The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

An example final report is available to capture deliverables, including pre and post photos, data collection requirements, and a checklist describing records like the signed 10-year contract and best practice and design plans the Sponsor should maintain.

Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Hlk Upland And Fish Habitat Projects: Project: Upland & Fish Habitat Projects on Camelot & Sherwood Lakes
Purpose: Tri-Lakes Management District is sponsoring a Healthy Lakes project to install best practices on four properties.
Project activities include:
\2022 John Kolinski (Camelot)
o Native Planting
\2022 Sharon Shermernhorn (Sherwood)
o Native Planting
\2022 State of Wisconsin (LSPOA project)
o Fish Sticks
\2022 Steve and Joan Schwegel
o Diversion Practices
o Rain Garden

Project deliverables: All data collected, all outreach and event materials, agendas and minutes from meetings. Specifically:
\2022 Signed 10-year conservation contract with maintenance requirements
\2022 Before and after photos of each practice.
\2022 Rain garden - number and species of plants, rain garden size and size of drainage area.
\2022 Rock Infiltration - size of impervious drainage area and volume of rock trenches.
\2022 Native plantings - type and number of plants; planted area dimensions.

Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Camelot Lake
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Hlr - Habitat Projects On Lakes Sherwood, Camelot & Arrowhead: Partnering with property owners, Tri-Lakes Management District, is sponsoring a grant to implement best practices from Wisconsin's 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq.ft., native plantings, diversions, rock infiltration and /or rain gardens, will be designed and installed according to program fact sheets, technical guidance and grant application.
All funded best practices required contracts that must remain inplace for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor's, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: a project summary including data requirements, pre/post photographs and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special Conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award. This does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Ditch
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Chester Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Arrowhead Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Arrowhead lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Lupine seed to be purchased from Wild Seed Nursery for Karner Blue compatibility. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
4/15/2018
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Upland & Fish Habitat On Camelot & Sherwood: This project implements best practices described in Wisconsin\2019s Healthy Lakes Implementation Plan. Practices may include fish sticks, 350 ft2 native plantings, diversion, rock infiltration, and rain gardens, and all best practices must follow the associated Healthy Lake technical guidance.

The best practices require a 10-year contract and must include minimum operation and maintenance requirements and data collection as described in grant condition #24. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the Sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #24 is required. The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

An example final report is available to capture deliverables, including pre and post photos, data collection requirements, and a checklist describing records like the signed 10-year contract and best practice and design plans the Sponsor should maintain.

Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2019
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Hlk Upland And Fish Habitat Projects: Project: Upland & Fish Habitat Projects on Camelot & Sherwood Lakes
Purpose: Tri-Lakes Management District is sponsoring a Healthy Lakes project to install best practices on four properties.
Project activities include:
\2022 John Kolinski (Camelot)
o Native Planting
\2022 Sharon Shermernhorn (Sherwood)
o Native Planting
\2022 State of Wisconsin (LSPOA project)
o Fish Sticks
\2022 Steve and Joan Schwegel
o Diversion Practices
o Rain Garden

Project deliverables: All data collected, all outreach and event materials, agendas and minutes from meetings. Specifically:
\2022 Signed 10-year conservation contract with maintenance requirements
\2022 Before and after photos of each practice.
\2022 Rain garden - number and species of plants, rain garden size and size of drainage area.
\2022 Rock Infiltration - size of impervious drainage area and volume of rock trenches.
\2022 Native plantings - type and number of plants; planted area dimensions.

Special conditions: WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Coordinator.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Hlr - Habitat Projects On Lakes Sherwood, Camelot & Arrowhead: Partnering with property owners, Tri-Lakes Management District, is sponsoring a grant to implement best practices from Wisconsin's 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq.ft., native plantings, diversions, rock infiltration and /or rain gardens, will be designed and installed according to program fact sheets, technical guidance and grant application.
All funded best practices required contracts that must remain inplace for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor's, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: a project summary including data requirements, pre/post photographs and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special Conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award. This does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes-14-Mile Watershed Water Quality Sampling: The Tri-Lakes Management District is sponsoring a monitoring project to assess baseline water quality and the efficacy of BMP implementation in conjunction with the 9-Key Element plan and monitoring in-lake water quality and E. coli monitoring of Tri-Lakes.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, consistent with the 9-Key Element Plan that includes methodologies, results, and management alternatives discussion with an implementation element.

Specific project activities include: 1) In-Lake water quality & clarity monitoring; 2) tributary monitoring; 3) E. coli monitoring in lakes; 4) consultation with Adams County LWCD, DATCP and DNR for BMP implementation and monitoring the effects of BMP\2019s; 5) ) consultation with Adams County LWCD, DATCP and DNR for verification of STEPL and SNAP+ model results.

Special Conditions: 1) All data will be entered into SWIMS Database; 2) All data collection will be done with Department approved protocols; 3) All data to be made available to partner agencies.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
4/15/2017
Waters Involved
Gilbert Lake
Status
Complete

Gilbert Lake Advancment Association Inc: Hlk - Gilbert Lake Healthy Lakes 2017: Partnering with property owners, the Gilbert Lake Advancement Association, Inc. is sponsoring a grant to implement water quality and habitat best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including fish sticks, 350 sq. ft. native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #16 at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of the Healthy Lakes initiative, if applicable.

Special conditions: Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
3/7/1997
Waters Involved
Johns Lake
Status
Complete

John'S Lake Management District: Acq-John'S Lake Land Acquisition - Marek Property: The John's Lake Lake Management District will acquire approximately 9.2 acres of land, including 550 feet of shoreline, situated on the western shore of John's Lake in Waushara County, for lake protection purposes. The primary goals of the land management plan are 1) to protect the lake's health and water quality by protecting a water recharge/wetland area for the lake contained on the property; 2) to ptotect the aquatic plant beds located off shore which support fisheries habitat and spawning; 3) to preserve the property in it's natural state to protect it's wildlife amd waterfowl habitat.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Jordan Pond
Status
Complete

Portage County Lcd: Lco-Portage Lakes Class 3: Portage County seeks to implement Phase 3 of its lake management planning efforts for 17 lakes in Portage County to help facilitate county-wide lake protection planning. Major project elements to include: 1) individual lake resident/user surveys and plan development, 2) web-based reporting system, 3) build-out assessment and predictive modeling, 4) development of guide for local boards and commissions, 5) final project report.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Klein Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
2/6/1997
Waters Involved
Kusel Lake
Status
Complete

Waushara County: Acq-Kusel Lake Land Acquisition - Petersen Property: Waushara county will acquire approximately 30.78 acres of land with 1,150 feet of shoreline to preserve and protect the shoreline and water quality of Kusel Lake. the primary goals of the property's management plan will be 1) TO MAINTAIN THE PROPERTY AS OPEN S[ACE/PARKLAND, 2) TO PRESERVE AHND RPOTECT THE PROPERTY'S SHORELINE IN ITS NATURAL STATE, 3) TO PRESERVE AND PROTECT THE PROPERTY'S WETLANDS, AND 4) TO ALLOW PUBLIC ACCESS FOR PASSIVE RECREATION INCLUDING HIKING AND CROSS COUNTRY SKIING.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Res-Arrowhead Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Arrowhead lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Lupine seed to be purchased from Wild Seed Nursery for Karner Blue compatibility. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Hlr - Habitat Projects On Lakes Sherwood, Camelot & Arrowhead: Partnering with property owners, Tri-Lakes Management District, is sponsoring a grant to implement best practices from Wisconsin's 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq.ft., native plantings, diversions, rock infiltration and /or rain gardens, will be designed and installed according to program fact sheets, technical guidance and grant application.
All funded best practices required contracts that must remain inplace for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor's, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: a project summary including data requirements, pre/post photographs and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special Conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award. This does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Lake Huron
Status
Complete

Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.


Grant Details
Lake Protection Grant
Date
4/15/2018
Waters Involved
Lake Huron
Status
Complete

Lake Huron Assn: Hlk - Huron Lake Healthy Lakes Projects: Partnering with property owners, the Huron Lake Association is sponsoring a grant to implement best practices from Wisconsin\2019s Healthy Lakes Implementation Plan. Best practices, including native plantings, diversions, rock infiltration, and/or rain gardens, will be designed and installed according to the Healthy Lakes fact sheets, technical guidance and grant application.

All funded best practices require contracts that must remain in place for 10 years and include the minimum operation and maintenance requirements described in grant condition #24 of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practice(s) will be implemented on land other than the sponsor\2019s, a Conservation Contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details, and data to be collected is required.

The Department may perform site inspections and/or monitoring to ensure project success.

Deliverables include: Signed 10-year landowner Conservation Contract(s) with operation and maintenance requirements; data collected; pre and post project installation photographs; and summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: The state share of each best practice cannot exceed $1,000. Project management and technical assistance costs cannot exceed 10% of the state share of the grant award; this does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction, and all regulatory requirements apply. Funding cannot be used for mitigation or regulatory compliance activities. The Healthy Lakes logo should be used for promotion and publicity and DNR recognized as a funding source.

This scope summarizes the scope in the grant application and attachments and does not supersede those application tasks/deliverables.


Grant Details
Lake Protection Grant
Date
3/15/1994
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Lakes Camelot/Sherwood Shoreland Zoning Audit: Adams County proposes to conduct a shoreline zoning audit of Lakes Camelot and Sherwood for the purposes of identification of suspected violations of the Adams County shoreline protection ordinance, establsihment of a current record of all current shoreland uses, and establishing a baseline for the assessment of the effectiveness of permitting and enforcement processes. Project activities will include the location and diagramming of structures within 75 feet of the ordinary highway mark, follow-up questionnaires, file review and the development of a public education on the importance of the shoreline protection ordinance.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Sherwood
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Hlr - Habitat Projects On Lakes Sherwood, Camelot & Arrowhead: Partnering with property owners, Tri-Lakes Management District, is sponsoring a grant to implement best practices from Wisconsin's 2019 Healthy Lakes & Rivers Action Plan. Best practices, including fish sticks, 350 sq.ft., native plantings, diversions, rock infiltration and /or rain gardens, will be designed and installed according to program fact sheets, technical guidance and grant application.
All funded best practices required contracts that must remain inplace for 10 years and include the minimum operation and maintenance requirements described in the special conditions at the end of this agreement. If the landowner is the grant sponsor this Lake Protection Grant Agreement serves as the contract. If the best practices will be implemented on land other than the sponsor's, a contract between the sponsor and landowner describing the 10-year contract period, minimum operation and maintenance details and data to be collected is required. The Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: a project summary including data requirements, pre/post photographs and confirmation of completed design work and landowner contracts. A Healthy Lakes & Rivers Example Report is available to assist you.
Special Conditions: Project management and technical assistance cash costs cannot exceed 10% of the state share of the grant award. This does not include implementation labor. Water regulation and/or county zoning permits must be issued before construction. Projects required for regulatory compliance purposes, including shoreland mitigation projects are not eligible for reimbursement. The Healthy Lakes & Rivers logo should be used for promotion and publicity and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes-14-Mile Watershed Water Quality Sampling: The Tri-Lakes Management District is sponsoring a monitoring project to assess baseline water quality and the efficacy of BMP implementation in conjunction with the 9-Key Element plan and monitoring in-lake water quality and E. coli monitoring of Tri-Lakes.

Project final deliverables include: all data collected, agendas and minutes for planning meetings, consistent with the 9-Key Element Plan that includes methodologies, results, and management alternatives discussion with an implementation element.

Specific project activities include: 1) In-Lake water quality & clarity monitoring; 2) tributary monitoring; 3) E. coli monitoring in lakes; 4) consultation with Adams County LWCD, DATCP and DNR for BMP implementation and monitoring the effects of BMP\2019s; 5) ) consultation with Adams County LWCD, DATCP and DNR for verification of STEPL and SNAP+ model results.

Special Conditions: 1) All data will be entered into SWIMS Database; 2) All data collection will be done with Department approved protocols; 3) All data to be made available to partner agencies.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lemonweir River -Un Oxbow
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Roche A Cri Creek
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Little Yellow River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Long Lake
Status
Complete

Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lyman Lake
Status
Complete

Waushara County: Acq-Meinen Land Acquisition On Lyman/Hartford Lake: Waushara County proposes to purchase 70 acres of land known as the Meinen parcel on Lyman (Hartford) Lake to be used for conservancy purposes.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Nepco Lake
Status
Complete

Wood County: Lco-Shoreland Ordinance Rev.: Wood County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Onland Lake
Status
Complete

Portage County Lcd: Lco-Portage Lakes Class 1: The Portage Co. Land Conservation Dept. proposes to conduct a series of studies to help shape the management of 28 Portage County lakes, and to help local planners in the development of land use regulations in the vicinity of these lakes. Major project elements to include: 1) Citizen surveys, 2) Planning meetings, 3) I&E, including web-based reports and access to data, 4) Development of a menu of management options, 5) Baseline Land-use Inventory, 6) Calculation of build-out impacts based on existing regulatory framework, 7) Development of guide for local planners.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Parker Lake
Status
Complete

Parker Lake Assoc., Inc.: Hlk-Parker Lake Fish Sticks: Parker Lake Association Inc. will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: Installation of 8 fish stick clusters on the shoreline of Parker Lake.
The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #16 is required.
The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.
Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Creek
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Res-Peppermill Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Peppermill Lake. Grant funds will be distributed to fund establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Condition: Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/10/1997
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Lmi-Petenwell Flowage Water Quality Monitoring: Golden Sands Resource Conservation and Development Council, Inc. proposes to complete the second year of funding for water quality modeling of the Petenwell Flowage. The models being used in applying the methodology on Petenwell Flowage include: 1) the Flux Reservoir loading Model, 2) Profile Model, 3) Bathtub Model. Implementation of this plan will provide information on the following: 1) water/nutrient budget for the Petenwell Flowage, 2) sources of nutrients, 3) effects of nutrient reduction, and 4) prediction of the total maximum daily loads necessary to reach desired target nutrient levels. A working Model will be provided as well as a finel report will be available for interested parties.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Petenwell Lake
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2008
Waters Involved
Pickerel Lake
Status
Complete

Portage County Lcd: Lco-Portage Lakes Class 2: The Portage Co. Land Conservation Dept. proposes to conduct a series of studies to help shape the management of 28 Portage County lakes, and to help local planners in the development of land use regulations in the vicinity of these lakes. Major project elements to include: 1) Citizen surveys, 2) Planning meetings, 3) I&E, including web-based reports and access to data, 4) Development of a menu of management options, 5) Baseline Land-use Inventory, 6) Calculation of build-out impacts based on existing regulatory framework, 7) Development of guide for local planners.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Pickerel Lake
Status
Complete

Portage County Lcd: Res_Portage County Restore: Portage County proposes to offer technical assistance and other coordination and outreach services to citizens involved in the development of lake management plans and the implementation of shoreland restorartion practices on their riparian properties. Major project elements to include outreach and coordination.


Grant Details
Lake Protection Grant
Date
9/1/1997
Waters Involved
Pleasant Lake
Status
Complete

Pleasant Lake Improvement Corporation: Lmi-Pleasant Lake Run Off Control: Pleasant Lake Improvement Corporation proposes to implement their stormwater runoff control plan. The project diverts the runoff and it's associated sediments and pollutants away from Pleasant Lake and into a sand discharge area. The project activities include North and South diversions removed and replaced, a speed bump and west edge ramp removed and replaced as called for in the approved plans.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Plover River
Status
Complete

Portage County Lcd: Lco-Portage Lakes Class 3: Portage County seeks to implement Phase 3 of its lake management planning efforts for 17 lakes in Portage County to help facilitate county-wide lake protection planning. Major project elements to include: 1) individual lake resident/user surveys and plan development, 2) web-based reporting system, 3) build-out assessment and predictive modeling, 4) development of guide for local boards and commissions, 5) final project report.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Unnamed
Status
Complete

Juneau County: Lco-Shoreland Ordinance Rev.: Juneau County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Unnamed
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Castle Rock Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Castle Rock Lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Space between rip-rap to be filled with soil and vegetated to facilitate successful access of turtle hatchlings to water. Lupine seed to be of a wild variety compatible with Karner Blue butterflies. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
7/1/2008
Waters Involved
Wisconsin River
Status
Complete

Portage County Lcd: Lmi-Portage Lake Nutrients: The Portage Co. Land Conservation Dept. proposes to continue its funding of a nutrient management educator position to work with agricultural producers to reduce phosphorus inputs into the Upper Wisconsin River watershed and associated flowages.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Proposed

Adams County: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
3/15/2021
Waters Involved
Wisconsin River
Status
Complete

Adams County: 319 Match - Lmi - 14-Mile Watershed 9-Key Elements Plan Implementation: Goals: 1) Hire a LWCD staff person to work with property owners and partners in the 14-mile watershed 2) Work with 14-Mile watershed LWCD's to build partnerships with property owners and agriculture 3) Work to achieve a 35% reduction of phosphorus to meet 9-Key Element plan and Wisconsin River TMDL goals 4) Assist other county and state staff to build partnerships with the WPVGA, 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and agricultural interests 5) Conduct 10 different site visits per year to implement BMP's 6) Create educational opportunities with landowners for BMP's, Soil Health and a producer led watershed group 7) Inventory 65 miles of ditches and streams for nutrient control options 8) Work with agencies to direct cost sharing funds to partners. Project deliverables: 1) Minimum of three year position for staff person 2) Assigned area is beyond county boundaries for travel and tasks 3) Annual reports on the goals in the application and scope 4) Track acreage and duration of BMP installations and reduction of nutrient loading 5) Track 9-Key Element Plan completed goals 6) Track educational meetings and speakers 7) Complete report with data, maps, BMP's and modelled/empirical reductions of nutrients 8) Attend 14-Mile Creek Watershed Alliance, Tri-Lakes Management District and other partner meetings. Specific conditions: 1) Complete summary of the project and recommend any improvements on forms provided 2) Participate in semi-annual or annual progress report meetings with DNR and County Conservationist, that include: a list of practices to reduce nonpoint source pollution installed since during the period for which you are seeking reimbursement. For each practice, include date installed, cost and estimated load reductions for N, P, and Sediment lb/yr; a 1-2 paragraph narrative description of project status, including project milestones, accomplishments, and roadblocks encountered.


Grant Details
Lake Protection Grant
Date
7/1/2008
Waters Involved
Wisconsin River Flowage Number 2 49
Status
Complete

Portage County Lcd: Lmi-Portage Lake Nutrients: The Portage Co. Land Conservation Dept. proposes to continue its funding of a nutrient management educator position to work with agricultural producers to reduce phosphorus inputs into the Upper Wisconsin River watershed and associated flowages.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2009
Waters Involved
Wolf Lake
Status
Complete

Adams County: Res-Adams Restore Cost Share: The Adams County Land Conservation Department proposes to provide 75% cost shares to riparian property owners interested in establishing and maintaining shoreland buffers and rain gardens with native vegetation. Cost share agreements to require that property owners maintain buffers for a minimum of 25 years.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Camelot Lake - Tri Lakes Sanitary Survey: The Town of Rome proposes to complete a sanitary survey on Lake Camelot in cooperation with the Tri-Lakes Management District and Adams County. The project activities include: 1) Compile data on existing septic systems, 2) assess septic systems impact on Camelot Lake's water quality, 3) assess alternatives, 4) work with all governmental units to develop management strategies including new possible town sanitary district. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemeinated to the public by newsletter and, public meeting(s), local radio/TV promotions and local newspaper articles. A final comprehensive management plan will be completed and available to the public for review.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Hydro Budget/Nutrient Load: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Complete Groundwater Study: The Town of Rome proposes to study groundwater inflow and outflow associated Adams County's Tri-Lakes through monitoring on Lake Camelot. Project activities would include: 1) Minipiezometer sampling, 2) lab analysis, and 3) completion of maps and reports. The Department of Natural Resources will be provided both a paper and electronic copy of the final report. Project results will be disseminated through newsletter mailings, distribution of a fact sheet, public meetings, local newspaper articles and development of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Toxics Study/Monitoring: The Town of Rome proposes to investigate the presence of toxins in the water and sediments of Adams County's Tri-Lakes through studies conducted on Lake Camelot. Project activities would include: 1) sediment and water sampling, 2) sample analysis, and 3) summarization of data for inclusion in Tri-Lakes grant series final report and Comprehensive Management Plan. The Department of Natural Resources will be provided both paper and electronic copies of the report. Project results will be disseminated through newsletter mailings, fact sheet distribution, public meetings, local newspaper articles and development of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Camelot Lake
Status
Complete

Adams County: Beach Club Plan: Develop a plan for restoration, improvement and maintenance of the beach clubs that can be incorporated into the lake management plan for the Tri-Lakes and the to-be-developed 9 Key Element Plan for the 14Mile Creek Watershed.
Activities include:
\2022 Identify owners of each project property
\2022 Inventory properties, including measuring, surveying, photographing, and identifying problem issues
\2022 Develop designs and suggestions of possible BMP/restoration practices for each project property
\2022 Educational/informational meetings with project property owners and form advisory groups
\2022 Advisory group meetings to prioritize issues and develop management plans
\2022 Follow up meetings for property owners to present advisory group plans, gain approval and finalize plan
\2022 Integrate individual plans into one beach club plan and present for review and possible approval to Tri-Lakes Management District and watershed 9 Key Element planners for incorporation into their plans--also present beach club plan to WDNR for approval
Deliverables: All data collected, all outreach and event materials, agendas and minutes from meetings.
\2022 List of all owners to be contacted for each club
\2022 Identification of problem issues for each project parcel
\2022 Parcel-specific designs for each project parcel with alternatives for each problem issue identified
\2022 Formation of advisory groups for each parcel and determination of priorities for each
\2022 Draft plan to present to the multiple owners of each project property
\2022 Incorporation of chosen plans into larger plans
Special conditions: WDNR Lakes Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the WDNR in a format specified by the Lakes Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
2/15/2018
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Beach Club Plan: Develop a plan for restoration, improvement and maintenance of the beach clubs that can be incorporated into the lake management plan for the Tri-Lakes and the to-be-developed 9 Key Element Plan for the 14Mile Creek Watershed.
Activities include:
\2022 Identify owners of each project property
\2022 Inventory properties, including measuring, surveying, photographing, and identifying problem issues
\2022 Develop designs and suggestions of possible BMP/restoration practices for each project property
\2022 Educational/informational meetings with project property owners and form advisory groups
\2022 Advisory group meetings to prioritize issues and develop management plans
\2022 Follow up meetings for property owners to present advisory group plans, gain approval and finalize plan
\2022 Integrate individual plans into one beach club plan and present for review and possible approval to Tri-Lakes Management District and watershed 9 Key Element planners for incorporation into their plans--also present beach club plan to WDNR for approval
Deliverables: All data collected, all outreach and event materials, agendas and minutes from meetings.
\2022 List of all owners to be contacted for each club
\2022 Identification of problem issues for each project parcel
\2022 Parcel-specific designs for each project parcel with alternatives for each problem issue identified
\2022 Formation of advisory groups for each parcel and determination of priorities for each
\2022 Draft plan to present to the multiple owners of each project property
\2022 Incorporation of chosen plans into larger plans
Special conditions: WDNR Lakes Coordinator will be provided with an electronic (pdf or word) copy of all data and maps from the project. This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the WDNR in a format specified by the Lakes Coordinator.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/2/1991
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Lake Arrowhead Water & Nutrient Budgets And Management Plan: WATER BUDGET TO BE DETERMINED BY SAMPLING STATION SETUP, GROUNDWATER INFLOW ESTIMATE, NYDRAULIC CONDUCTIVITY TO BE INVESTIGATED, WEEKLY RAINFALL AND EVAPORATION DATA WILL BE COLLECTED. SEASONAL NUTRIENT BUDGET WILL BE ESTABLISHED. WATER GAIN AND LOSS FOR THE LAKES WILL BE CALCULATED. MANAGEMENT PLAN WILL BE DEVELOPED AND DISSEMINATED.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Sanitary Survey: The Town of Rome proposes to complete the following sanitary survey activies, in cooperation with the Tri-Lakes Management District, and Adams County, on the area adjacent to Lake Arrowhead; 1) Compile exsisting data on the septic systems. 2) Assess septic systems impact on the watershed and on Lake Arrowhead's water quality. 3) Assess alternative options. 4) Working with all government units develop management strategies including new possible town sanitary district.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Monit./Internal Nut. Load Tri Lake: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Modeling & Report: The Town of Rome proposes to produce a report describing the results of the first three tasks in this series of studies associated with the Adams Counties Tri Lakes (including Lake Arrowhead). Project activities would include generation and distribution of a report. The Department of Natural Resources will receive both a paper and electronic copy of the report. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and distribution of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Tri-Lakes Management Plan: The Adams Co. Land Conservation Department proposes to develop a watershed management plan for the Tri-Lakes (Arrowhead, Sherwood, Camelot) area of Adams County. Major project elements to include: 1) meetings with stakeholder groups, 2) review existing data, 3) plan development, 4) public meetings, 5) plan distribution. The DNR will be provided both paper and electronic (PDF) files of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Lake Huron
Status
Complete

Lake Huron Assn: Lake Huron Comprehensive Lake Study: The scope of this project includes multiple components with appraisal objectives. Baseline data will be collected on several areas including aquatic plants, groundwater flow, lake water quality, watershed features and water levels. The aquatic plant survey will incorporate line intercept methods and include 10 shore transects for emergent/wetland species. A water quality appraisal will include April, June, July, Aug, and October events with parameters listed in application scope. (pesticide analysis not to be funded) Watershed appraisal will include definition of boundary, land use, sensitive areas, and likely sources of sediment/nutrients with strategic recommendations.

Water level and groundwater appraisal will include piezometer install and monitoring to define flow paths and water level impacts.


Deliverables: 1. A summary report will be prepared to include all indicated appraisal components.

This scope is intended to summarize the more specific scope as provided in the grant application and does not supersede the specific scope elements described within the application.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood - Tri-Lakes Septic System Inventory: The Town of Rome proposes to complete the following sanitary survey activities, in cooperation with the Tri-Lakes Mangaement District, and Adams County, on the areas adjacent to Lake Sherwood: 1) Compile existing data on the septic systems. 2) Assess septic systems impact on the watershed and on Lake Sherwood's water quality. 3) asses alternative options. 4) working with all governmental units develop management strategies including new possible town sanitary district.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood H2o Monitor/Internal Load: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood Groundwater Inflo & Plant Study: The Town of Rome proposes to study causes of algae and weed growth in Lake Sherwood, Adams Co., by studying groundwater inflow into both Lake Sherwood and Lake Camelot. Major elements would include: 1) Minipiezometer sampling around backwaters and bays, 2) Infield analysis for choride and phosphorus, 3) Development of report, 4) Interstitial water sampling and analysis from acquatic plant beds, 5) Acquatic plant analysis for nitrogen and phosphorus, 6) Algal identification/qualification. The Department of Natural Resources will be provided both paper and electronic copies of the final report. Project results will be disseminated to the public through newsletter mailings, fact sheet distributions, public meetings, local newspaper articles and development of a comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood Nutrient Budget & Water Quality Conditions: The Town of Rome proposes to complete tasks begun under LPLs 638 and 640, studying stage elevations and flow velocities, sampling water quality, and estimating loadings in Lakes Camelot and Sherwood of the Adams County Tri-Lakes. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) and water sampling to assess nutrient loading. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Long Lake
Status
Complete

Long Lake District: Long Lake Comprehensive Study Phase I: The Long Lake District proposes to conduct a comprehensive lake study to evaluate the chemical, biological and physical factors affecting Long Lake and their relationship to nuisance Aphanothece growth. Project deliverables include inlake water testing; groundwater testing; groundwater flow monitoring; lake mapping and plant surveys. See consultant's proposal in the application for more detail.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Long Lake
Status
Complete

Long Lake District: Long Lake Comprehensive Study Ph 2: Long Lake District proposes to implement Phase 2 of a study that will culminate in the development of a long-term comprehensive lake management plan for Long Lake. Phase 2 will consist of in-lake water testing, groundwater testing, septic system testing, water table investigations, and the development of a lake management plan. Sample results from both Phase 1 and 2 will be used to develop the comprehensive lake management plan. The Department of Natural Resources will be provided with both a paper copy and electronic copy of the final plan.

Amendment #1: The Long Lake District proposes to include a county-wide educational outreach task to develop and distribute informational packets to new lake residents concerning lake stewardship. Their final report will include an example of this informational packet and a summary of this outreach effort's activities and outcomes.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
3/28/1996
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Petenwell Flowage Water Quality Modeling: Golden Sands proposes to conduct water quality modeling on the Petenwell Flowage to identify nutrient loads. Project activities include 1)applying the FLUX, BATHTUB, and PROFILE models, resulting in model outputs and data summaries; 2) determining water and nutrient budgets, resulting in a report; 3) predicting the effects of nutrient reductions on other in-lake environmental variables, resulting in a report; and 4) specifying the total maximum daily loads needed to reach target nutrient levels, resulting in a report. The sponsor will disseminate information to the public about the results of the project by public meeting and summary report mailing. The sponsor will also provide the Department of Natural Resources with a paper copy of the final report. End.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Wisconsin River
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Fourteenmile Creek Watershed
Watershed Recommendations
Best Management Practices, Implement
Portage TMDL Stormwater Planning
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated construction erosion control ordinance; updated storm water ordinance for new development and re-development; other new ordinances that affect runoff from the developed urban area; updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
Portage County Manure Storage
Date
Status
This project is a landowner installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will implement: a manure storage system; and a barnyard runoff control system.
1/1/2018
In Progress
Projects
 
Best Management Practices, Implement
WI Rapids Storm Water Management Plan Update
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the developed urban area.
1/1/2016
In Progress
Projects
Documents
 
Best Management Practices, Implement
Stevens Point Stormwater Mgmt Plan Updates
Date
Status
This project is an installation of nonpoint source best management practices to contribute to the restoration of Wisconsin's waters and was funded by the 319 grant. Specifically, the grantee will cost share updates to the city's storm water management plan to assist the city to comply with expected Wisconsin River TMDL wasteload allocations for TP and TSS and recent changes to NR 151. Activities will include modeling, ordinance updates, a feasibility study for BMP retrofits, and site assessments for proposed BMPs, including environmental hazard, wetland, cultural resource, and endangered and threatened species evaluations.
1/1/2014
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Habitat Restoration - Shoreland
 
Date
Status
10/1/2013
Proposed
Projects
 
Hold Workshops
 
Date
Status
5/22/2010
Proposed
Projects
 
Lakes Protection Grant
 
Date
Status
Adams County has a successful Citizen Monitoring program established. Adams County is encouraged to seek grant opportunities to continue their Citizen Lake Monitoring work.
9/30/2010
Proposed
 
Stormwater Planning, Implementation
Friendship Stormwater Mgmt Plan - TMDL Analysis & Recs
Date
Status
This project promotes nonpoint source best management practices to contribute to the restoration of Wisconsin?s waters and was funded by the 319 grant. Storm water planning activities will be undertaken by the municipality and will result in the following products: updated storm water management plan for the entire developed urban area; and an updated storm water management plan for new development.
1/1/2018
In Progress
Projects
 
Urban Growth Planning
Wisconsin Rapids, Wood County
Date
Status
SSA Planning and Updates for Wisconsin Rapids
4/1/2011
In Progress
Projects
 
Water Quality Planning
AWQMP Program - SEWRPC
Date
Status
sewrpc program 2021
1/1/2021
In Progress
Projects
 
Fourteenmile Creek WatershedWatershed History Note

The Fourteenmile Creek Watershed is home to the Leola Marsh Wildlife Area, an 1,860 acre property located 15 miles southeast of Wisconsin Rapids. The wildlife area is predominately non-native cool season grassland that formerly was marsh that had been drained for agricultural purposes in the first part of the 1900's. The wildlife area sits in the heart of the area first studied by the Hamerstroms on the prairie chicken. It is in the southern portion of Wisconsin's prairie chicken range. The property was purchased to protect the grassland habitat for the prairie chicken. Frederick and Frances Hamerstrom attended the University of Wisconsin to study wildlife management under Aldo Leopold. Frederick Hamerstrom was one of only three men awarded a doctorate under Leopold and Frances was the only woman graduate student under Leopold to earn a master's degree. Leopold started the Hamerstroms on a study of the imperiled greater prairie chicken, an endangered species in Wisconsin. The Hamerstroms focused on the habitat needs of the greater prairie chicken and initiated a management plan based on the assumption the prairie chicken required a "checkerboard" pattern of habitat. The Hamerstroms were recognized in 1970 with the National Wildlife Federation Award for Distinguished Service to Conservation for their innovative management plan and work with the prairie chicken. The Hamerstroms are credited by naturalists for saving the prairie chicken from extirpation in Wisconsin.

Date  2011